Princeton University Orders Mullen Class 3 EV Truck

Mullen Automotive recently announced that Princeton University in Princeton, N.J., recently purchased a Mullen THREE, Class 3 electric vehicle (EV) box truck upfit for its facilities operations unit, according to a news release. The unit includes about 350 vehicles—including cars, vans, golf carts, and construction vehicles—for various transportation needs around campus. The university launched a fleet of 17 electric buses and charging facilities in fall 2023 in an effort to achieve net-zero carbon emissions by 2046, the university’s 300th anniversary.

“We are proud to work with Princeton in their journey towards a net-zero carbon emissions campus,” said Mullen Automotive CEO and chairman, David Michery. “This purchase marks a significant milestone for Mullen as we continue to expand our presence in the higher education sector.”

The Mullen THREE Class 3 low cab forward EV truck is all electric and features a 125-mile range with a large payload. The chassis’s rail design supports upfits and customization for specific vocational needs. The truck recently qualified for a $15,000 incentive through the State of Massachusetts’ MOR-EV program and a $45,000 cash rebate voucher through the California Hybrid and Zero-Emission Truck and Bus Voucher Incentive Program, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Hartwick College Debuts Baking Innovation Lab

    Hartwick College in Oneonta, N.Y., recently debuted its new Baking Innovation Lab (BIL), part of the Hartwick Center for Craft Food and Beverage, according to a news release. The 3,500-square-foot facility serves as a lab for innovation, collaboration, and experimentation within the food and grain sector.

  • Cañon City High School groundbreaking

    New Addition, Renovations to Bring Major Upgrade to Cañon City High School Campus

    Colorado's Cañon City Schools has broken ground on a new construction project at its flagship institution, Cañon City High School.

  • California District Opens New K–8 School

    The Chino Valley Unified School District in Chino, Calif., recently announced that construction is complete on the new Legacy Academy K–8 School, according to a news release. The $51-million, 73,000-square-foot facility has the capacity for about 1,250 students.

  • Case Systems makerspace

    Case Systems Launches Line of K–12 Learning Spaces Installations

    Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

Digital Edition