Princeton University Orders Mullen Class 3 EV Truck

Mullen Automotive recently announced that Princeton University in Princeton, N.J., recently purchased a Mullen THREE, Class 3 electric vehicle (EV) box truck upfit for its facilities operations unit, according to a news release. The unit includes about 350 vehicles—including cars, vans, golf carts, and construction vehicles—for various transportation needs around campus. The university launched a fleet of 17 electric buses and charging facilities in fall 2023 in an effort to achieve net-zero carbon emissions by 2046, the university’s 300th anniversary.

“We are proud to work with Princeton in their journey towards a net-zero carbon emissions campus,” said Mullen Automotive CEO and chairman, David Michery. “This purchase marks a significant milestone for Mullen as we continue to expand our presence in the higher education sector.”

The Mullen THREE Class 3 low cab forward EV truck is all electric and features a 125-mile range with a large payload. The chassis’s rail design supports upfits and customization for specific vocational needs. The truck recently qualified for a $15,000 incentive through the State of Massachusetts’ MOR-EV program and a $45,000 cash rebate voucher through the California Hybrid and Zero-Emission Truck and Bus Voucher Incentive Program, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.