The State of California’s Public Interest Energy Research (PIER) Program was developed to support public-interest energy research and development that will help improve the quality of life in that state by bringing environmentally safe, affordable, and reliable energy services and products to the marketplace. The PIER Program is managed by the California Energy Commission, which annually awards as much as $62 million to conduct the most promising public interest energy research by partnering with research, development, and demonstration (RD&D) organizations, including individuals, businesses, utilities, and public or private research institutions.

What follows are findings from the final report for the Integrated Classroom Lighting System (ICLS) Project, which was conducted by Finelite Inc. and directed by the Architectural Energy Corporation.

• Lighting typically represents 20 percent of the total energy use in a K-12 school. By reducing the connected lighting load and giving teachers more control of the lighting system, significant energy savings can be realized while providing a higher quality of light.

• Lighting in classrooms may potentially impact the rate of learning. Lighting whiteboards, teaching walls, students’ and teachers’ desks, and teachers’ faces is fundamental to the learning process.

• Building schools requires coordination between school administrators and teachers, and their architects, engineers, construction managers, and contractors. Making these parties aware that it is time to change from old, out-of-date lighting systems to new, more effective ones is a major challenge.

• Installing improved, up-to-date lighting systems is a cost-effective way to spend school construction dollars. Nevertheless, many decision-makers believe they cannot afford quality indirect lighting because they rely on inaccurate or out-of-date cost estimates or advice.

• New, energy-efficient indirect lighting systems can reduce lighting loads by almost 20 percent. Cutting energy waste in classroom lighting reduces operating expenses for the school.

• The current building boom in schools creates an opportunity to ensure that effective classroom lighting systems are installed. However, since classrooms do not go through regular updates or remodels, missing this window of opportunity means up to a 30- to 40-year wait for the next chance to improve a particular school’s classroom lighting.

• New methods of learning and other factors affect the way classrooms should be lighted. These changes mean that old, proven ways to light classrooms are obsolete.

For more information on the PIER Program, please visit the Commission's Web site at:

www.energy.ca.gov/research/index.html or contact the Commission's Publications Unit at 916-654-5200.

Featured

  • Minnesota District Starts Construction on Early Childhood Learning Center

    Sauk Rapids-Rice Public Schools in Sauk Rapids, Minn., recently announced that construction has begun on a new early childhood learning center and a new outdoor activities complex, according to a news release.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • University of Kentucky Reopens Scovell Hall

    The University of Kentucky recently reopened Scovell Hall, part of the Martin-Gatton College of Agriculture, Food and Environment (CAFE), following comprehensive renovations to the 120-year-old facility in Lexington, Ky., according to a news release.

  • Health & Science Building

    Health & Science Building

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The College of Western Idaho's Health & Science Building has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.