A Pending Disaster?

Living in a throw-away world is a very expensive place to live. Too many of us have bought into the “out with the old, in with the new” lifestyle — from fashions, to furniture, to cell phones, TVs — the list goes on. One reason is what some manufacturers refer to as planned obsolescence. How many people do you know who still use a five-year-old cell phone? Most of us trade phones every two years, need it or not! It is an innate desire to own something a little newer, a little better or a little sooner than is really necessary. We scrimp, save and continuously empty our wallets so we can own the latest thing. Conversely, little effort is put into taking care of what we already have. This is true of our school facilities as well.

School buildings cannot fall victim to our throwaway mentality. We have invested too much and need to do what it takes to protect that investment. When we look at the poor condition of many of our school facilities, we need to remember that it was not a lack a quality construction that caused the problems; it was more likely a lack of proper maintenance.

In 2010, more than $14.5 billion dollars of construction was put in place at K-12 schools across the nation. For many institutions, it was a difficult economic challenge to secure funds for these assets. For most institutions, funding the construction is where the investment stopped. Funding the maintenance of these buildings was put in the “think about that later” column. This message was echoed by the respondents of our maintenance survey where 74 percent reported that tight budgets have forced them to defer maintenance; 62 percent reported that not enough funds had been allocated to pay for the activities outlined in their Comprehensive Maintenance Plan; and that 54 percent did not have adequate staffing levels to maintain their facilities.

Not to scare anyone, but the National Research Council (NRC) of the National Academy of Sciences (NAS), in a 1990 report, determined an appropriate budget allocation for routine maintenance and repair should be in the range of two to four percent of the current replacement value of a facility. If we don’t start thinking about the maintenance of our schools as “essential,” we are headed for disaster — maybe not this year, but soon.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition