Proper Planning Ensures Sound Results

Music Facility 

Walnut High School in Walnut, Calif., had a bond passed to build a $3-million band and orchestra building. They turned to Wenger’s “Planning Guide for Secondary School Music Facilities” to figure out the best solutions for designing and furnishing the facility and justifying the costs.

When there were just rumors of a new music building, I called Wenger immediately,” says Dr. Buddy Clements, Band director at Walnut High School in Walnut, Calif. Eventually, a bond passed to build a $3-million band and orchestra building.

“Wenger’s ‘Planning Guide for Secondary School Music Facilities’ helped me do my homework and justify my requests,” Clements recalls.

Clements and Corey Wicks are full-time instrumental music directors leading three concert bands, wind ensemble, jazz ensemble, two string orchestras, full symphonic orchestra and even mariachi band!

Clements says their previous rehearsal room wasn’t very flattering to certain instruments — the alto voices — and over-projected bass instruments. “With our new rehearsal room and acoustical panels, I now hear all the frequencies and timbres,” he explains. “The panels make a tremendous impact.”

For individual practice, five SoundLok practice rooms feature VAE technology that offers realistic acoustical simulations and digital record/playback capabilities.

“Students practice in the rooms constantly, so I know they’re enjoying them,” explains Clements. Students can practice without disturbing rehearsals.

To ensure proper posture and comfort, Clements requested 200 Student Chairs from Wenger. Many of the Student Chairs he had purchased 25 years ago are still in service.

He also appreciates the longevity of his original Conductor’s System — podium, chair and stand — that he’s used for 30 years. For instrument storage, UltraStor cabinets protect belongings and improve traffic flow. “Wenger’s information and support, helped me know what my students and I needed up front,” Clements concludes.

www.wengercorp.com

This article originally appeared in the School Planning & Management July 2013 issue of Spaces4Learning.

Featured

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.