Water Conserving Urinal

water-conserving urinal 

On average, a water-conserving urinal conserves 40,000 gallons of water per urinal, per year. With this savings in water you can enhance your students’ restroom experience with Betco air care and skin care.

School districts across the U.S. are looking for ways to save money. Drought conditions and water bans in Central Texas led Pflugerville ISD to install Betco’s Smart Restroom System, a water conserving urinal system. This innovative system is on track to save in excess of 10 million gallons of water per year, and provides a comprehensive solution to building owners, managers and facility management to reduce operating cost, meet the growing trend in environmental responsibility for LEED and BOMA 360 certified properties and exceed the ever increasing expectations of tenant and building occupant’s for environmental responsibility, building cleanliness and personal hygiene.

Betco Smart Restroom System uniquely meets these needs through the provision of program and product systems that reduce operating costs through reduced water consumption and energy to heat water, assists in LEED and BOMA 360 certification by providing the opportunity to gain points from reduced water consumption and energy to heat water, plus the use of environmentally responsible cleaning and maintenance products, and improves student satisfaction with clean, hygienic and pleasant restrooms.

District Executive Director Bill Clayton says, “Most waterless urinals were expensive and burdensome to maintain. They required totally replacing the existing urinal, which usually was at least as expensive as the one being replaced. This typically would cause the restroom wall and/or floor to need repair after the old urinal was removed and before the new one was installed. The Betco SmartValve was presented to us for consideration. The installation was simple, it used the existing valve body and urinal so there was no facility renovation required.”

www.betco.com

This article originally appeared in the School Planning & Management August 2013 issue of Spaces4Learning.

Featured

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • i-PRO, NovoTrax Partner for New School Emergency Response Solution

    i-PRO Americas, Inc., which manufactures edge computing cameras, recently announced a partnership with NovoTrax, provider of end-to-end life safety and mass notification solutions, to address gaps in emergency response workflows at K–12 schools, according to a news release.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

Digital Edition