Demonstrating a Commitment to Sustainability

Vanderbilt University Crystal Terrace

Lochinvar helped Vanderbilt University to maintain a commitment to sustainability when it came time to upgrade the Crystal Terrace building.

Vanderbilt University in Nashville, TN, continues to demonstrate its commitment to sustainability as part of its SustainVU efforts, an ongoing program to improve the university’s impact on the community and the environment. As part of these efforts, the Vanderbilt Plant Services team set out to replace the existing boiler system as part of an efficiency upgrade at its Crystal Terrace building in October 2010.

Crystal Terrace is a nearly 110,000-square-foot multi-tenant building used by Vanderbilt University Medical Center. The facility houses multiple floors of offices as well as the Finance Department, Strategic Planning Department, Women’s Health Services and the Space and Facilities Planning Department.

The Vanderbilt Plant Services team met with Lochinvar to discuss options for replacing the 25-year-old existing steel tube atmospheric boiler. The Vanderbilt team chose to replace the existing boiler with the high-efficiency CREST and Power-Fin models.

Despite the complexity of getting the boilers into the mechanical room, the CREST Boiler’s SMART TOUCH operating control simplified the rest of the installation. Utilizing CREST’s built-in cascading sequencer, the two boilers are operating in a cascade sequence as a front-end loading system. The CREST carries the load approximately 80 percent of the time, and the Power-Fin is brought on during the coldest days to help meet the largest heating demands.

Since the installation, the Vanderbilt Plant Services team reports that the Crystal Terrace building has used an average of 23 percent less fuel per month in comparison to the old system.

“Vanderbilt has made sustainability a top priority in recent years, and we continue to work towards enhancing environmental efficiency on campus,” states Mike Gable, P.E., CEM, Office of Space and Facilities Planning. “We could not be more pleased with the performance of this technology and the significant energy savings we have achieved as a result of this upgrade.”

www.lochinvar.com

This article originally appeared in the College Planning & Management December 2013 issue of Spaces4Learning.

Featured

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • William Penn Charter School

    Richard A. Balderston OPC’69 Lower School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Richard A. Balderston OPC’69 Lower School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.