Never Get Called on the Carpet

Sponsored content by L & M CONSTRUCTION CHEMICALS

At least thousands maybe hundreds of thousands. That’s what you’ll save with an FGS/PermaShine polished concrete floor. The explanation is really pretty simple. FGS/PermaShine floors don’t scuff, scratch, peel, chip, mark or any of the other things that mess up any other kind of floor.

Why? Because unlike other floors, FGS/PermaShine floors aren’t just thin coatings or wax. The beauty of PermaShine is built right into the concrete so it never wears off and it never wears out. That means you’re saving money from day one.

Keeping your floor looking new is simply elementary. FGS/PermaShine polished concrete floors don’t really need a lot of care. Sweep them, wash them, use them. That’s it. Really. Nothing to replace, no stripping and no high maintenance costs. Ever.

Old school. New school. This just might be the best part. The FGS/PermaShine system works just as well on an old floor as it does a new one. We’ve restored floors that were over 100 years old. Compare FGS/PermaShine restoration to replacement costs and you’re in for a very nice surprise.

FGS/PermaShine floors are GreenSpec certified and contribute to LEED points for their sustainability and environmental advantages? (Ask about our FREE Guide to Polished Concrete and LEED.)

Slip into something more comfortable. Not on the floor. FGS/PermaShine floors aren’t slippery, despite their shiny appearance. In fact, The National Floor Safety Institute (NFSI) certified FGS/PermaShine as “High Traction” floors. That means that your new floor will maintain the same non-slip characteristics as bare concrete.

How do you graduate to a PermaShine floor? That’s easy — and less expensive than other floor options. Give us a call or check us out at www.FGS-PermaShine.com.

This article originally appeared in the issue of .

Featured

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • CU-Lock Haven Receives $1.75M Gift for New Entrepreneurship, Media Center

    Commonwealth University-Lock Haven in Lock Haven, Penn., recently received a $1.75-million donation from entrepreneur and alumnus Nicholas Subich ’17, according to a university news release. The funds will go toward establishing the Nicholas Subich Center for Entrepreneurship and Media, a technology-driven hub for innovation and experiential learning.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.