Selecting the Right Dance Flooring

Sponsored content by HARLEQUIN FLOORS

Are you specifying a floor to be used for dancing? Harlequin Floors will answer all your questions to ensure you provide the right flooring for your school’s specific dancing requirements.

Why is a DANCE FLOOR mandatory and not a sports floor?

It is a common misperception that a well-designed sports floor will suit the needs of dancers. There are two intrinsic differences, however: the construction of the sprung subfloor and the performance surface.

Sprung dance floors have a combination of shock absorption and energy return. Sprung dance floors provide lift, but do not have excessive rebound (or a trampoline effect). A slip-resistant vinyl surface is vital to avoid slips and falls.

Sports floors have a high degree of energy return not suitable for dancing. Sports floors are also stiffer, because cushioned footwear keeps athletes’ feet comfortable, whereas dancers do not perform in sneakers. They are barefooted or in dance shoes, which require specific dance flooring.

To specify the correct floor, you need to know answers to questions such as: Which types of dance are to be performed? Is the flooring to be permanent or portable? Will the floor be in a theater or multipurpose room? Will the floor be used for touring? Is there an existing cement, wood or sprung subfloor? Are there moisture barriers, ceiling height limits, door swing or ramp requirements?

You will find a great deal of pertinent information at HarlequinFloors.com, including:

  • CAD drawings
  • Three-part specifications
  • ARCAT Spec Wizard
  • Product datasheets and downloads
  • Cleaning and maintenance information
  • Standards and tests CPM

This article originally appeared in the issue of .

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • USC Launches Major AI Initiative After $200M Gift

    The University of Southern California in Los Angeles, Calif., recently announced that it has launched a “transformational” new AI initiative thanks to a $200M gift, according to a news release. The project will leverage AI toward breakthroughs and innovations in subjects like the health sciences, business, security, and the arts.