Selecting the Right Dance Flooring

Sponsored content by HARLEQUIN FLOORS

Are you specifying a floor to be used for dancing? Harlequin Floors will answer all your questions to ensure you provide the right flooring for your school’s specific dancing requirements.

Why is a DANCE FLOOR mandatory and not a sports floor?

It is a common misperception that a well-designed sports floor will suit the needs of dancers. There are two intrinsic differences, however: the construction of the sprung subfloor and the performance surface.

Sprung dance floors have a combination of shock absorption and energy return. Sprung dance floors provide lift, but do not have excessive rebound (or a trampoline effect). A slip-resistant vinyl surface is vital to avoid slips and falls.

Sports floors have a high degree of energy return not suitable for dancing. Sports floors are also stiffer, because cushioned footwear keeps athletes’ feet comfortable, whereas dancers do not perform in sneakers. They are barefooted or in dance shoes, which require specific dance flooring.

To specify the correct floor, you need to know answers to questions such as: Which types of dance are to be performed? Is the flooring to be permanent or portable? Will the floor be in a theater or multipurpose room? Will the floor be used for touring? Is there an existing cement, wood or sprung subfloor? Are there moisture barriers, ceiling height limits, door swing or ramp requirements?

You will find a great deal of pertinent information at HarlequinFloors.com, including:

  • CAD drawings
  • Three-part specifications
  • ARCAT Spec Wizard
  • Product datasheets and downloads
  • Cleaning and maintenance information
  • Standards and tests CPM

This article originally appeared in the issue of .

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • NWEA Report Recommends K–12 Natural Disaster Recovery Strategies

    The Northwest Evaluation Association (NWEA), a K–12 assessment and research organization, recently announced the release of a new playbook for schools and communities recovering from extreme weather events, according to a news release.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.