School Construction Tops $90 Million in First Half of 2014

CHEYENNE, Wyo. — The Equality State spent $91,587,886 on K-12 school construction during the first six months of 2014, according to Bill Panos, Director of the Wyoming School Facilities Department (SFD). The total includes money for planning, design, construction, land and various professional services, such as engineers, architects and contractors. “The construction season is very busy throughout the state,” Panos said. “SFD is working closely with school districts to ensure our school construction projects maximize value to communities across Wyoming.”

Wyoming is home to 48 school districts. Since 2002, the state has appropriated over $2.7 billion for school construction and maintains over 21 million square feet of educational facilities. “We are fortunate to live in a state where both the governor and Legislature are committed to providing children with high quality educational facilities,” Panos said.

Featured

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.