School Construction Tops $90 Million in First Half of 2014

CHEYENNE, Wyo. — The Equality State spent $91,587,886 on K-12 school construction during the first six months of 2014, according to Bill Panos, Director of the Wyoming School Facilities Department (SFD). The total includes money for planning, design, construction, land and various professional services, such as engineers, architects and contractors. “The construction season is very busy throughout the state,” Panos said. “SFD is working closely with school districts to ensure our school construction projects maximize value to communities across Wyoming.”

Wyoming is home to 48 school districts. Since 2002, the state has appropriated over $2.7 billion for school construction and maintains over 21 million square feet of educational facilities. “We are fortunate to live in a state where both the governor and Legislature are committed to providing children with high quality educational facilities,” Panos said.

Featured

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.