UMass Amherst's Iconic Old Chapel Nominated to National Register of Historic Places

AMHERST, MA — The University of Massachusetts Amherst’s iconic Old Chapel, which is about to undergo major renovations after years of disuse, has been nominated for listing on the National Register of Historic Places.

Reviewing the nomination proposal written by the private advocacy group Preserve UMass and supported by UMass Amherst, the Massachusetts Historical Commission reported that it believes the building meets the criteria for the federal recognition for both its historic and its architectural significance.

Betsy Friedberg, MHC National Register director, said her staff will edit the nomination proposal to meet National Register standards and return it to Preserve UMass for review. When completed, the proposal will be brought to MHC’s State Review Board for a vote. Once approved at the state level, it will be sent to the National Park Service for final approval and listing.

The Old Chapel, designed by Worcester architect Stephen Earle in the Romanesque Revival style, was completed in 1885. Its granite and brownstone exterior and its position overlooking the Campus Pond have made it the unofficial symbol of the Commonwealth’s flagship campus.

Over its history it served as classroom building, library, auditorium, museum and chapel and was home to the UMass Minuteman Marching Band until it was deemed unsafe in 1996. It has been largely unused since, although it houses the university’s 42-bell carillon. Plans are under way to renovate and reopen the facility.

In the late 1990s, the unstable clock tower was rebuilt, with the original stones anchored to a new concrete frame.

UMass Amherst Chancellor Kumble R. Subbaswamy initiated the Old Chapel renovations in 2013 during the university’s sesquicentennial year, appointing a committee of faculty, staff and students to report on the best ways of using the building. The chancellor determined that future uses must serve to renew bonds with alumni and create ties with future students.

Under the renovation plan, the chapel’s top floor will provide a large open space for performances and lectures and will be available for weddings and similar events. The multi-purpose first floor will provide a flexible layout for displays, events and will serve as a general campus resource. The basement will hold utilities, a kitchen facility and restrooms.

Juanita Holler, associate vice chancellor for facilities and campus services at UMass Amherst, says, “Whatever is done to the chapel will respect its historic character but also meet all current building codes while achieving environmental comfort and energy efficiency.”

She said the architectural firm of Finegold Alexander of Boston has been hired to design the renovations. Total cost is estimated at $18 million to $20 million.

“It is exciting to be going through the National Register nomination process,” Holler says. “It reflects well on our concern and care for our historic structures.”

The National Register of Historic Places is the official list of the nation’s historic places worthy of preservation. Authorized by the National Historic Preservation Act of 1966, the Register is part of a national program to coordinate and support efforts to identify, evaluate and protect America’s historic and archeological resources.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • California District Opens New Continuation High School

    The Fort Bragg Unified School District (FBUSD) in Fort Bragg, Calif., recently held a ribbon-cutting ceremony for Noyo High School, a continuation high school that provides alternative education options for students in grades 6–12, according to a news release. The district partnered with Quattrochi Kwok Architects for design and FRC Inc. for construction, and the project’s funding came from Local Bond Measure B.

  • DLR Group Hires Three for Higher Education Practice

    Integrated design firm DLR Group recently announced that it has brought three new hires on board to help shape its higher education practice in California and the northeast, according to a press release.