Buffalo State College: Technology Building

Buffalo State College: Technology Building

PHOTOS © 2014 TIM WILKES PHOTOGRAPHY

SUNY Buffalo State’s new three-story, 87,000-square-foot Technology Building establishes a technology-based educational center, which will be a focal point for industry education and integrated learning. It replaces existing facilities inadequate for high-tech manufacturing research and instruction.

Project architect, The S/L/A/M Collaborative, fulfilled project goals to create a facility that would elevate the visibility of technology on campus, maximize shared teaching spaces, attract and retain faculty, provide shared student resources space and be an incubator for regional industry.

According to school officials, the facility supports Governor Andrew M. Cuomo’s innovation agenda through its smart-grid laboratories with cutting edge equipment. “This new asset will better prepare our workforce and train our students for the jobs of tomorrow, while also encouraging innovation and nurturing new businesses right here in Western New York,” Governor Cuomo said in a press statement, when the building officially opened in September 2013.

The facility includes labs for teaching and research, lean production, materials testing, environment and information technologies. It also includes smart classrooms, lecture halls and support spaces. Among the subjects offered are fashion and textile technology, electrical engineering technology, mechanical engineering technology and computer information systems.

The LEED Gold-certified building is a showpiece for technology and a teaching tool for sustainability. It is also a campus hub for the largely commuter-based student body.

Sustainability features include an extensive green roofing system on the lower roof to mitigate stormwater and heat loads; photovoltaic solar panels are mounted on the upper roof to provide renewable energy for a portion of the electrical loads. The long axis of the linear bar building runs east to west, reinforcing Buffalo State’s master plan for a linear pedestrian mall. The linear bar configuration and the building’s orientation allows ample daylighting and exterior access to four high-bay project spaces on the first floor. Additionally, student projects are featured on a digital display that also provides real-time updates on building systems’ performance.

This article originally appeared in the issue of .

Featured

  • Michigan School District Installs New Gun-Detection Platform

    Williamston Community Schools in Williamston, Mich., recently announced that it has installed the ZeroEyes gun-detection video analytics platform for its five schools, according to a news release. ZeroEyes is the only solution of its kind with a U.S. Department of Homeland Security SAFETY Act Designation and adds an AI gun-detection and intelligent situational awareness software layer into existing school security cameras.

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • Cedar Crest College to Build Criminal Justice Facility

    Cedar Crest College recently announced it will create a new Expert Witness Training Center and Crime Scene Lab for its campus in Allentown, Pa., according to a news release. The college is one of eight in the country to have earned Forensic Science Educational Programs Accreditation Commission (FEPAC) accreditation for its undergraduate and graduate programs.

  • Studio G Announces Completion of New Massachusetts Elementary School

    The Groton-Dunstable Regional School District in Groton, Mass., recently announced the completion of a new elementary school, according to a news release. Florence Roche Elementary School measures in at 110,000 square feet and has the capacity for 645 students in grades K–4.