Valparaiso University: Beacon Hall

Valparaiso University: Beacon Hall

PHOTOS © MARIUSZ MIZERA

In February 2013, the design-build team of FGM Architects/Mortenson Construction began planning Valparaiso University’s Beacon Hall; the first new residence hall identified in the Indiana-based school’s recently adopted campus master plan. The campus plan envisions supportive and responsive student living environments through the phased replacement or renovation of many of the existing 1960s-era residence halls and establishes the Collegiate Gothic style for campus residences.

The 85,550-square-foot, 292-bed Beacon Hall features two-, three- and four-bedroom room suites with doubles and singles, each with shared baths. Community spaces include a ground floor living room and fireplace and a commons adjacent to the courtyard with views to the campus beyond. Shared space on the typical floors encompasses a variety of study rooms — some quiet, some open and more socially oriented — kitchenettes and recreation/support spaces. A non-denominational prayer room supports the university’s faith-based mission.

“One project goal was to provide a transition between the all-shared facilities of freshman year to full apartment-style communities of upper-class students,” states Brandon Lipman, principal at FGM Architects. “FGM/Mortenson and the university project planning committee, including deans, Residential Life, facilities staff and students, carefully considered Valparaiso’s culture and mission and reviewed alternative models of in-suite living arrangements in order to develop the hall’s ‘transitional’ suite model.”

The project’s 12-month construction timeline required FGM/Mortenson to select building systems to meet both this ambitious schedule and the university’s goals of an enriching residential experience, craftsmanship, sustainability, high quality and maintainability. In response, the team utilized prefabricated, brick-faced structural/architectural precast concrete and unitized bathroom pods. Prefabrication allowed for accelerated, cost-effective construction.

This past fall, students entered Beacon Hall’s “house” pavilion and began enjoying their new home away from home.

This article originally appeared in the issue of .

Featured

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.