St. Elizabeth Ann Seton School

Project Snapshot

PROJECT: St. Elizabeth Ann Seton School
LOCATION: Keller, Texas
COMPANY NAME: Stonhard
WEBSITE: www.stonhard.com

THE CHALLENGE

The design decision makers at St. Elizabeth Ann Seton School, in Keller, Texas, set out to complete corridor and restroom floors to meet the needs of their school. The criterion was wear-resistant floors that would stand up to continuous foot and cart traffic while reducing noise. They also required floors that are easy to keep clean and safe, even when slippery. Finally, this forward thinking school wanted design and color integrated into the overall décor.

St. Elizabeth Ann Seton School

St. Elizabeth Ann Seton School

Colors and geometrical patterns guide students through hallways and corridors while providing a bright and inspiring environment.

THE SOLUTION

Terrazzo flooring was originally specified for the job, until a strong recommendation from a general contractor changed the minds at St. Elizabeth’s. The general contractor had recently worked with Stonhard’s commercial product line and he endorsed Stonhard based on his experience on a construction management level, as well as the quality of the products. They presented the school with an option to traditional terrazzo, Stonres RTZ, a seamless, urethane system infused with rubber aggregate chips. This system provides exceptional acoustic efficiency and ergonomic comfort while providing a superior wear and stain resistant floor.

It is also offered in the colors and dynamic design scheme the school was seeking. Multi-colored aggregate in a highperformance matrix allows Stonhard to create intricate patterns and incorporate geometric shapes in an endless palette of colors. The use of a unique rubber aggregate produces much quieter floors and eliminates echoes and reverberation.

The installation of the Stonhard floors in the school’s new wing was done in November of 2004. The floor was ready for foot traffic after only 12 hours, and within 48 hours it was available for full service.

IMPACT ON LEARNING

Towards the completion of the installation, a teacher stopped the Stonhard Project Manager to let him know the floors had changed how both teachers and students felt about their building. She said, “The floors really make a difference.” The floors at St. Elizabeth Ann Seton motivate staff, students and parents with bright, bold colors and patterns and have helped to fuel an environment that is educational and imaginative. With its new flooring, the school has become a place where creativity is encouraged with colorful and durable floors that require minimum maintenance. The projects initial goals, student comfort and safety, have been met and surpassed thanks to the flooring choices.

Editor's Review

We have learned that our most successful schools provide a welcoming atmosphere. We also know that color impacts student achievement, as well as teacher effectiveness and staff efficiency. Research has demonstrated that specific colors influence the health, morale, emotions, behavior and the performance of learners. When you apply that to school flooring, and couple that with longevity and safety factors, the result is definitely going to have a positive influence on a student’s ability to learn and the school’s ability to use more of its resources for hands-on educational expenses.

This article originally appeared in the issue of .

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Auburn University Debuts $224M STEM + Agricultural Sciences Complex

    Auburn University in Auburn, Ala., recently opened its new $224-million STEM + Agricultural Sciences Complex, the largest research construction project in the university’s history, according to university news. The facility measures more than 265,000 square feet and brings six departments from the College of Agriculture and College of Sciences and Mathematics together under one roof.

  • ZeroEyes, Academic Innovators Partner to Provide Safety Solutions

    ZeroEyes, which produces a multi-analytics weapons detection and threat intelligence platform, recently announced a partnership with Academic Innovators, according to a news release.