Time to Make Some Facility Changes

If you would like to make some changes to your existing facility to support your early childhood education program but don’t have a lot of money, here are some ideas that might work for you.

  • Install low sinks in a non-carpeted area for children to easily wash their hands and tools (such as paint brushes).
  • Install carpet in the rest of the classroom for sound absorption.
  • If you don’t have windowsills, create shelving under the windows to hold science experiments and growing plants that need light, recommends Peter J. Pizzolongo, associate executive director of Washington-based National Association for the Education of Young Children (NAEYC) (www.naeyc.org).
  • Install bulletin board display rails at the students’ eye level on the wall to display artwork and to prevent ripping paint off the wall when removing tape.
  • Install solidly constructed storage units with doors so that materials not being used (such as glue, paint and glitter) are out of sight and out of reach of small hands.
  • What to do with fluorescent light? Cover the tubes with pink sleeves or installing panels featuring blue sky with white clouds. “This is terrific for classrooms where students have sensory integration delays, ADHD or are hyper sensitive to light,” indicates Barbara Romano, MAEL, principal/early childhood coordinator of Barrington Community Unit School District 220’s Early Learning Center in Illinois.
  • Similarly, install different kinds of lighting at different angles to make classrooms feel cozier.
  • Speaking of cozy, put an adult-sized and a child-sized rocking chair in each classroom.
  • Outfit the entrance to each classroom with cubbies in a U-shape, along with a rug and bench to sit on to take off boots.
  • Paint the walls in subdued earth tones for a calming, neutral environment. Color is added in the form of the students’ artwork displayed throughout the room.

This article originally appeared in the issue of .

Featured

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.