Zero Core Drilling Makes for Easy Installation

Troxell Communications, a nationwide leader in educational technology products and solutions for more than 60 years, helps educators create a more interactive environment for students. For that reason, Troxell was made the primary facilitator for all campus or classroom projects at a community college in northern California.

Recently, the college needed Troxell’s services to retrofit three lecture halls in one of the campus buildings. The project demanded that cable management of audio and visual equipment, such as projectors and speakers, be connected from the lecture podium to the entire classroom in each of the three rooms. However, because the podiums were located several feet away from the walls, Troxell was challenged with accessing the required power.

Troxell Account Executive Nick O’Day remembered Connectrac from a trade show and considered his options. Because of the building’s structure and budget, core drilling was eliminated.

Other wire channel systems were considered, but when comparing the products with Connectrac Wireways, the answer became crystal clear.

“Connectrac has a better overall build,” O’Day notes. “The look and feel of the product is higher quality.”

As Troxell prepared to install the wireways, they discovered a potential challenge in the lecture halls having uneven floors. With the adaptability that comes with Connectrac’s Wireway and its 288-inch electrical infeed and power outlet, the potential road block ended up not causing a single hiccup in the installation. “The wireways went in quickly,” explains O’Day. “We really liked the electrical assembly. It provided all the flexibility and all the wires we needed to connect everything together.”

Troxell completed the installation at the community college quickly and affordably while also maintaining the integrity of the lecture rooms’ aesthetics.

“As our product evolves, we continue to find ways to alter and improve it to make cable management available for any environment,” concludes Steve Batchelder, director of sales at Connectrac.

www.connectrac.com

This article originally appeared in the issue of .

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition