Conservation and Choice Make Lighting Upgrades Easy

Lighting Upgrades

Great performance along with guaranteed energy conservation made Cree the obvious choice when it came to replacing 2,553 lights at Toledo Public School facilities.

The Toledo Public Schools (TPS) Maintenance and Operations Department supports 42 schools in Toledo, Ohio. As the director of Maintenance and Operations, Quintin Reynolds is responsible for finding new ways to save energy. Reynolds along with key staff member, Ron Miller, and TPS’s energy consultant, Palmer Conservation Consulting, worked to save energy by replacing 2,553 outdoor metal halide and high-pressure sodium lights with Cree LED luminaires.

In addition, TPS wanted to turn the opportunity into a teachable moment for students by building an interactive energy dashboard providing real time energy usage data.

The Maintenance and Operations Department with Palmer Conservation Consulting chose Cree LED lights because of the product longevity, low maintenance and the 10-year limited warranty.

“Cree had a 10-year warranty when everyone else offered seven years or less,” says Miller. “The lighting quality is there and the fixtures are good quality — well built.”

“TPS likes the performance, price point, and how it looks compared to other lights on the market,” says Miller. “In addition, the lighting enhanced the look of the schools. Cree luminaires come in many colors so we could choose colors to complement the architecture of each school.”

During the lighting project, outdoor lighting at 42 schools was upgraded in a one-to-one replacement with Cree LED lights. Using existing poles, OSQ Series luminaires replaced flood and area lights in the parking lot, CPY Series replaced canopy lights at the school entrances, Cree EdgeTM Series replaced walkway lights, and XSP Series Wall Packs replaced existing accent lighting.

The crisp, white light of Cree’s luminaries create a safe atmosphere for students, administrators and visitors. As important, the Cree luminaires are backed by Cree’s 10-year industry-leading limited warranty, providing investment protection.

www.cree.com/lighting

This article originally appeared in the issue of .

Featured

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Auburn University Debuts $224M STEM + Agricultural Sciences Complex

    Auburn University in Auburn, Ala., recently opened its new $224-million STEM + Agricultural Sciences Complex, the largest research construction project in the university’s history, according to university news. The facility measures more than 265,000 square feet and brings six departments from the College of Agriculture and College of Sciences and Mathematics together under one roof.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • Johns Hopkins Starts Construction on New Residence Hall, Dining Facility

    The Homewood Campus of Johns Hopkins University in Baltimore, Md., recently began construction on a new residence hall and dining facility, according to university news. The work involves demolishing the existing Alumni Memorial Residence Hall I, which was built in 1923, to make room for the new facility.