Conservation and Choice Make Lighting Upgrades Easy

Lighting Upgrades

Great performance along with guaranteed energy conservation made Cree the obvious choice when it came to replacing 2,553 lights at Toledo Public School facilities.

The Toledo Public Schools (TPS) Maintenance and Operations Department supports 42 schools in Toledo, Ohio. As the director of Maintenance and Operations, Quintin Reynolds is responsible for finding new ways to save energy. Reynolds along with key staff member, Ron Miller, and TPS’s energy consultant, Palmer Conservation Consulting, worked to save energy by replacing 2,553 outdoor metal halide and high-pressure sodium lights with Cree LED luminaires.

In addition, TPS wanted to turn the opportunity into a teachable moment for students by building an interactive energy dashboard providing real time energy usage data.

The Maintenance and Operations Department with Palmer Conservation Consulting chose Cree LED lights because of the product longevity, low maintenance and the 10-year limited warranty.

“Cree had a 10-year warranty when everyone else offered seven years or less,” says Miller. “The lighting quality is there and the fixtures are good quality — well built.”

“TPS likes the performance, price point, and how it looks compared to other lights on the market,” says Miller. “In addition, the lighting enhanced the look of the schools. Cree luminaires come in many colors so we could choose colors to complement the architecture of each school.”

During the lighting project, outdoor lighting at 42 schools was upgraded in a one-to-one replacement with Cree LED lights. Using existing poles, OSQ Series luminaires replaced flood and area lights in the parking lot, CPY Series replaced canopy lights at the school entrances, Cree EdgeTM Series replaced walkway lights, and XSP Series Wall Packs replaced existing accent lighting.

The crisp, white light of Cree’s luminaries create a safe atmosphere for students, administrators and visitors. As important, the Cree luminaires are backed by Cree’s 10-year industry-leading limited warranty, providing investment protection.

www.cree.com/lighting

This article originally appeared in the issue of .

Featured

  • Texas District Breaks Ground on Second High School

    The Waller Independent School District in Waller, Texas, recently held a groundbreaking ceremony for what will become its second high school, according to a news release.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.