HVAC Makes Energy Usage Easy to Manage

HVAC system

A quick installation and the ability to control energy usage made Mitsubishi Electric’s HVAC system an easy choice when it came time to replace an inefficient system at Screven Elementary School.

Screven Elementary School in Sylvania, Ga., serves 1,400 Pre-K to fifth-graders. The 143,000-square-foot facility was built in 1989. A renovation of the school in 2002 took care of many issues, but left a dated and inefficient HVAC system sorely needing replacement. A CITY MULTI Variable Refrigerant Flow (VRF) zoning system from Mitsubishi Electric US, Inc. Cooling & Heating Division (Mitsubishi Electric) provided an efficient, cost-saving solution.

The pipes of the building’s original water-source heat pump system eventually deteriorated. William Bland, superintendent, Screven County School System, says, “There was no question about the need for a renovation of the HVAC system at the elementary school.”

Pruett, Ford & Associates, Inc., Augusta, Ga., was called in to specify the system. Bob Pruett, partner, supported the choice of a Mitsubishi Electric system because “we felt it would be less maintenance.” If one part of the previous system needed to be serviced, the whole system had to be shut down. “The Mitsubishi Electric system is compartmentalized, though, so if you lose a compressor you might lose part of a system, but never the whole system,” says Pruett.

The installation, completed in less than 12 weeks, took place over the summer when school was not in session. Dixon says, “It went unbelievably. If there was a problem we made a phone call and someone was there — more times than not — within the same day. It was remarkable.”

The VRF system allows Preston Dees, director of school safety and energy manager, Screven County School System, to monitor and control the cooling and heating in each classroom. Dees says, “Now we’re on a control system and we can manage our energy usage.” Controlling energy usage throughout the school from a centralized controller offers ease and cost savings. The savings in the first two years post-renovation have been substantial.

www.mehvac.com

This article originally appeared in the issue of .

Featured

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Stanford Online Reveals New Immersive Learning Studio

    Stanford Online recently marked its 30th anniversary with the announcement of a new immersive learning studio, according to a university news release. The studio takes advantage of AI-powered and immersive learning technologies to continue delivering personalized and faculty-led education.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.