Flooring Installation

Concrete slabs are the most common flooring base used in a range of buildings, including schools. Unfortunately, excessive moisture found in concrete slabs prior to a flooring installation can cause significant floor covering system failures such as debonding of coatings, microbial growth and flooring expansion.

There are, however, several steps that can be taken to mitigate and potentially prevent moisture issues before a floor covering is installed. These steps can be taken for either new or remodel projects.

The first step is to conduct moisture testing. Substrate surfaces must be tested for moisture emission prior to starting the installation. Most manufacturers and flooring installation contractors recommend Relative Humidity probe moisture testing.

If moisture emission is discovered, then proper precautions, such as the use of several topical applications prior to the flooring installation, can be used for moisture mitigation. Some of these topical applications include using reactive penetrants and moisture retarding coatings.

Finally, consider selecting a floor covering that has a higher tolerance for moisture and can perform in concrete slabs with elevated relative humidity levels. Some flooring options, such as a textile composite flooring, perform in areas with elevated moisture. The breathable nature of these flooring products allows moisture to pass through the backing rather than trap it underneath. This method of vapor transmission enables the flooring to be installed with no moisture mitigation as long as the Relative Humidity Test reads 95 percent or below.

Taking these steps prior to installation can save money and mitigate potential flooring system failures.

This article originally appeared in the issue of .

About the Author

David Daughtrey is the director of business development for education with J+J Flooring Group.

Featured

  • University of Mary Washington Selects Builder for New Theater, Dance Facility

    The University of Mary Washington in Fredericksburg, Va., recently announced that it has selected construction and development firm Skanska to lead a series of renovations and upgrades to fine arts facilities, according to a news release.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.