Flooring Installation

Concrete slabs are the most common flooring base used in a range of buildings, including schools. Unfortunately, excessive moisture found in concrete slabs prior to a flooring installation can cause significant floor covering system failures such as debonding of coatings, microbial growth and flooring expansion.

There are, however, several steps that can be taken to mitigate and potentially prevent moisture issues before a floor covering is installed. These steps can be taken for either new or remodel projects.

The first step is to conduct moisture testing. Substrate surfaces must be tested for moisture emission prior to starting the installation. Most manufacturers and flooring installation contractors recommend Relative Humidity probe moisture testing.

If moisture emission is discovered, then proper precautions, such as the use of several topical applications prior to the flooring installation, can be used for moisture mitigation. Some of these topical applications include using reactive penetrants and moisture retarding coatings.

Finally, consider selecting a floor covering that has a higher tolerance for moisture and can perform in concrete slabs with elevated relative humidity levels. Some flooring options, such as a textile composite flooring, perform in areas with elevated moisture. The breathable nature of these flooring products allows moisture to pass through the backing rather than trap it underneath. This method of vapor transmission enables the flooring to be installed with no moisture mitigation as long as the Relative Humidity Test reads 95 percent or below.

Taking these steps prior to installation can save money and mitigate potential flooring system failures.

This article originally appeared in the issue of .

About the Author

David Daughtrey is the director of business development for education with J+J Flooring Group.

Featured

  • University of Rochester to Break Ground on New Student Life Center

    The University of Rochester in Rochester, N.Y., recently began construction on a new Student Life building, according to a news release. The first floor will contain campus-wide gathering, program, and rehearsal space; the second floor will play home to the Greenbaum Center for Jewish Life.

  • Washington State University Debuts New Engineering Hall

    Washington State University recently celebrated a dedication ceremony for the new Schweitzer Engineering Hall on its Pullman campus in Pullman, Wash., according to university news. The facility measures 66,288 square feet, and its completion marks the first milestone in a larger university effort to modernize the engineering and design district.

  • R.I. District Holds Ribbon-Cutting Ceremony for New Elementary School

    Cranston Public Schools in Cranston, R.I., recently announced the completion of Gladstone Elementary School, according to a news release. The 100,000-square-foot facility serves as a replacement for the 1950s-era former building, and it consolidates the student, faculty, and staff populations of Gladstone and Arlington Elementary Schools.

  • Amazon Expands Lockers to More Than 500 College, University Campuses

    Amazon recently announced that its Locker Network now totals more than 750 locations at more than 500 college and university campuses around the United States, according to a company news release.