Defense Starts At the Entrance

Flooring is usually the first thing that is regularly compromised, especially at high-traffic entrances. Quick fixes using carpet tiles are often preferred, but are they always the best, cost-efficient approach? Your entrance is where the first line of defense should start for trapping dirt and water. Too often, less expensive alternatives like carpet tiles only add to the problem.

The flooring product industry has changed significantly and it will never stop changing, but the one thing that will be consistent is the significant role entrance flooring systems play to ensure the entrance is kept clean and safe for building users and maintenance staff.

Entrance flooring systems play an integral part by helping to keep the entrance safe from slip, trips and falls while providing exceptional defense for managing dirt and water entering your building. When dirt and water are introduced to carpet tiles, significant wear begins to occur, usually requiring frequent replacement and becoming costly after time. The purpose of all entrance flooring systems is to allow dirt and water to fall through the system, trapping debris underneath the system while keeping the top surface clean. These systems partner well with many types of conditions, depths and flooring products. Employing an entrance flooring system in a recessed pit allows for a smooth transition from one top surface to another and are also available for surface mounted applications using specific ADA-compliant frame options.

Entrance flooring systems combine design and functionality with an array of insert and logo options, including the ability to work with other types of surrounding flooring materials to optimize a positive first impression.

Now is the time to integrate an entrance flooring system in your new or existing building and win the war on dirt.

This article originally appeared in the issue of .

About the Author

Renee Hite is the assistant Business Development manager for interior wall protection at Construction Specialties. To learn more visit www.c-sgroup.com, call 800/233-8493 or email Renee at [email protected].

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition