BioFit Solution Extends Life of Mobile Folding Cafeteria Tables

Mobile Folding Cafeteria Tables

BioFit’s adjustable torsion cap keeps older tables folding and unfolding like the day they left the factory at Monrovia Elementary School.

Monrovia Elementary School in Huntsville, Ala., uses 27 BioFit 12-seat mobile folding tables in its cafeteria. As the 13-year warranty period for the tables was coming to an end, facilities manager Wayne Slater noticed the tables were becoming more difficult to fold and unfolded more quickly than they once had. Since the tables were in excellent shape otherwise, he contacted BioFit for help.

We informed Mr. Slater of a new, patent-pending component developed by BioFit to keep older tables folding and unfolding like the day they left the factory: the adjustable torsion cap. Regardless of the manufacturer, mobile folding tables use a lift-assist mechanism to facilitate safe and easy folding. Over time, these mechanisms lose torque, meaning it takes more force to fold a table and to keep it from unfolding too rapidly. Adjusting the torque level to original specifications alleviates this problem.

BioFit provided the caps needed to retrofit the Monrovia Elementary tables. Installation was fast, easy and effective. Afterward, Mr. Slater shared: “Since installing the adjustable torsion caps, I can close the tables with one hand. They work like new.”

Available on all new BioFit tables, the adjustable torsion cap eliminates an age-old issue with table lift-assistance devices. By enabling the re-establishment of the factory-specified lift capability, it facilitates safe operation through the life cycle of the product and allows customers to save money by avoiding costly repairs or delaying the need to replace failing tables. Additionally, due to the relative ease of retrofitting, the cap provides an economical way to refresh the lift on older tables in the field.

The adjustable torsion cap is another example of our mission to consistently improve the learning environment.

www.biofit.com

This article originally appeared in the issue of .

Featured

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.