What Should a School Consider Before Purchasing Classroom Barricade Devices, Also Known As Temporary Door Locking Devices?

Classroom barricade devices, which are added to existing classroom door openings, are not compliant with the model fire codes and building codes used in most states. These codes, designed to ensure the safety of building occupants, require door hardware that allows free egress, meets the accessibility standards, and does not negatively impact fire protection. In order for other locking methods to be allowable by code, the devices must be approved by the Authority Having Jurisdiction (AHJ), or the code must be modified. Even if a local code change is made, some devices may not meet the federal requirements of the Americans with Disabilities Act (ADA).

An additional concern is the potential for an unauthorized person to install the barricade device and secure the classroom in order to commit a crime. Once in place, many devices currently on the market restrict all access from the outside, preventing a school staff member or emergency responder from entering the room to help. School districts are advised to check with legal counsel in order to understand any liability issues that may exist.

This article originally appeared in the issue of .

About the Author

Lori Greene, DAHC/CDC, CCPR, FDAI, FDHI is the manager of Codes & Resources with Allegion.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Fellowes Expands Finish and Wall-Covering Options for Architectural Wall Systems

    Fellowes Architectural Solutions has expanded the materials library for its architectural wall systems with a series of new finishes and wall-covering options intended to provide architects and designers with additional choices for commercial interiors, according to a company news release.