What's in the Adobe Studio?

  • Adobe Digital StudioThe Studio introduces itself by cantilevering through a new 16- by 32-foot opening in the existing lobby’s east wall and is visible from the entrance below.
  • A stainless-steel-clad Help Desk varies from standing- to seating- to wheelchair-height to accommodate various seating configurations and interactions. Power and data ports allow ad hoc work teams to “plug in” anywhere — and include drains for spilled coffee.
  • A Video Production Studio includes a horizon-less green screen, which simplifies replacement of backgrounds in live video, and sound-absorptive wall panels to minimize sound flutter.
  • An Audio Production Studio houses audio recording and editing equipment.
  • Seating varies, from stools to chairs and modular “living room” groups to on-floor lounge chairs. All are portable.
  • Technical provisions allow collaborators to share live screen images from multiple computers within the group or on public screens within the Studio.
  • The “Behance Wall,” a cluster of wallmounted monitors — one of only three in the country and the only one outside of Adobe’s headquarters — streams projects based on criteria entered by touchscreen within the Studio.
  • Three-inch-high access flooring throughout allows access to and easy reconfiguration of data and power wiring as the future placement and technology evolves.

This article originally appeared in the issue of .

Featured

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.