What Results Should You Expect When Cleaning Is Genuinely Ergonomic?

The word ergonomic gets used abundantly in regard to cleaning, but that is because the primary resource in cleaning is manual labor. When you’re working with manual labor, good ergonomics have the potential to transform just about every aspect of the work with safer, more intuitive processes and tools. Put simply, for something to be ergonomic, it must be efficient and people-friendly. That can apply to every cleaning task from vacuuming the carpet to dusting the light fixtures.

That said, there is a difference between transformative ergonomics and superficial ergonomics. An example of superficial ergonomics would be to take a heavy and unwieldy tool and put a more comfortable handle grip on it. The hand might be more comfortable, but the task is still difficult to perform. Transformative ergonomics in cleaning could come from a drastic rethinking of how a task is done or from a slight tweak, but the improvements in your cleaning program should be undeniable if you are tracking key information.

When considering a switch to a new ergonomic approach, conduct your own in-house study to compare your existing method with the new ergonomic method. First, work with a cleaner on how to use new equipment or follow a new process properly. Then time how long it takes the cleaner to do the same task in the same space with both methods, and document the quality of the results. Afterwards, give cleaners a questionnaire about how intuitive the new method is and their physical comfort doing the task. After tracking these factors, the benefits of ergonomic methods should become apparent.

This article originally appeared in the issue of .

About the Author

Jacalyn High is director of Marketing for ProTeam Vacuums. She can be reached at 866/888-2168 or through proteam.emerson.com.

Featured

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.

  • Washington State University Debuts New Engineering Hall

    Washington State University recently celebrated a dedication ceremony for the new Schweitzer Engineering Hall on its Pullman campus in Pullman, Wash., according to university news. The facility measures 66,288 square feet, and its completion marks the first milestone in a larger university effort to modernize the engineering and design district.

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.