University of California, Santa Barbara: Davidson Library

University of California, Santa Barbara: Davidson Library interior and exterior images

PHOTOS © LERUM PHOTO

The $58.5 million renovation of the Davidson Library at University of California, Santa Barbara (UCSB) is designed to enhance teaching, learning and research at UCSB, meeting the needs of the campus’ growing student body. Constructed by C.W. Driver, various renovations including Fire and Life Safety upgrades and seismic retrofits were made in order to bring the existing library up to code while also incorporating a range of collaboration spaces, a café and numerous open-air study areas. C.W. Driver worked closely with the university and library staff throughout the entire project to lessen the impact of construction to students and staff, working around the university’s schedule.

Designed by Pfeiffer Partners, the renovations included the addition of a 62,000-square-foot, three-story building to the north of the library, which houses the Special Research Collections, a collection of rare artifacts and materials available to UCSB students, faculty and the scholarly community. Due to the historic contents, the space requires very tight humidity and temperature controls which are regulated by dedicated HVAC units and a large desiccant wheel dehumidifier. A cold room, designed to imitate a walk-in refrigerator, and a vault area were installed for the most sensitive and valuable items.

Davidson Library achieved LEED Gold certification and joins approximately 24 LEED-certified buildings already at UCSB. To achieve this distinction, C.W. Driver incorporated a number of aspects to optimize energy efficiency, improve indoor environmental quality and maximize the use and reuse of sustainable and local resources. Additionally, UCSB’s Davidson Library was one of the first Construction Manager at Risk (CMAR) projects — a delivery method where the construction manager is committed to delivering the project within a guaranteed maximum price — to be utilized within the University of California system.

Despite labor shortages in the region throughout the duration of the project, UCSB’s Davidson Library was completed on-budget, four months ahead of schedule.

This article originally appeared in the issue of .

Featured

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Barbara Vick Western Branch

    Barbara Vick Western Branch

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Barbara Vick Western Branch has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.