At The End of The Day

Vacuum cleaners and other floor machines that are well maintained and kept clean and serviced still need to be properly stored when not in use. Improper or careless storage of the best-kept cleaning tools can impact their effectiveness and useful life, and therefore your bottom line.

Be sure any equipment with a motor is shut down properly, per manufacturer’s specifications. This information is in the owner’s manual… which you should be sure to read and retain. Some machines may need idling time before being shut down completely. Whatever procedures are manufacturer-recommended for shutting down a piece of equipment should be followed.

Properly secure and store any cords, hoses, nozzles or other components for each machine as indicated by the manufacturer. Don’t toss these items on a shelf or in a box where they may be separated from the unit to which they belong. This is especially important if more than one person uses each unit, as the next person to use the unit may not be able to locate the pieces needed to properly operate the equipment.

Don’t shove your vacuums or floor machines into crowded closets or other cramped spaces. This can lead to other items being stacked against or on them, which can lead to damage — including dents and scratches, and worse — to the equipment. Tools that look neglected are more likely to be misused and neglected by the people who use them.

If you have outdoor storage units that are not heated, do not store power-operated machines in these spaces, especially in the winter. Machine components wear down more rapidly when started or operated in extreme cold conditions.

This article originally appeared in the issue of .

Featured

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.