Is it possible to both integrate and segment communications?

Yes! This is an exciting development in school communication platforms.

Integrators are physically wired to fire panels, lockdown switches or any electrical “normally open switch” for reliability and fast response. The number of switch inputs that can be monitored depends on your platform configuration.

When integrators detect changes in a switch’s physical status (e.g., a fire alarm is pulled), emergency alerts on the displays of your communications platform are instantly triggered. Detailed instructions can accompany visual displays and automated notifications to authorities may be texted or emailed.

Messages are delivered to displays in either “all-call” or “zoned” deployment. For all-call, a single emergency switch is monitored by one integrator, and a single message is created when the switch’s status changes. Your entire campus receives the same message; for instance, “Tornado warning, take shelter!”

For zoned configuration, multiple integrators are wired to monitor a single switch and the platform triggers different messages when the switch’s status changes. Integrators are assigned to groups of displays, allowing messages to be tailored for particular groups (zones) even if the alerts are triggered by the same alarm. For example, during a fire, all alerts might display “Fire emergency!” but the instructions may be “Exit Door A” for one zone and “Exit Door B” for another.

For routine messaging, communications platforms can deliver tailored daily messages.

Zoned messaging delivers more relevant communications, especially in emergencies. Schools are rightfully giving more thought to granular evacuation protocols, and clear and instant communications are at their core.

This article originally appeared in the issue of .

About the Author

Fred Bezat is product manager at American Time, a manufacturer of integrated, custom timekeeping and notification systems. Contact him at [email protected] or 877/666-1208.

Featured

  • Washington State District Breaks Ground on New Elementary School

    Cheney School District No. 360 in Spokane County, Wash., recently announced that construction has begun on a new elementary school, according to local news. The district held a groundbreaking ceremony on May 18 in Airway Heights for the yet-to-be-named school, which is scheduled to open in fall 2027.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.