Road Art That Lasts

Syracuse University

Syracuse University used Transpo Industries’ Color-Safe MMA Pavement Marking as a central part of their Connective Corridor project.

Syracuse University has been a staple in the City of Syracuse, NY, since 1870 and has always stayed at the forefront of continuous infrastructure innovation. Maintaining the state-of-the-art campus extends to their transit and transportation system, and to that end university officials and students created the “Syracuse Connective Corridor” project. This project set forth a goal, among others, to implement bike paths throughout the university, as well as connecting to the city. However, with the continuous university and city traffic coupled with the staggering winter weather conditions frequently seen in Syracuse, project officials were faced with an issue: finding a pavement marking material that would provide maximum durability while still maintaining the campuses beauty and offer maximum safety for cyclists.

For this they turned to Transpo Industries’ Color-Safe MMA Pavement Marking. Color-Safe is a new generation Methyl Methacrylate (MMA) resin component designed specifically for projects such as the Connective Corridor.

Color-Safe is easily distinguishable by its uniquely bright and resilient colors, a feature that fit in seamlessly with the university’s need to maintain the campuses famous scenic appeal.

Fitting with the university’s desire for eco-friendly practices, Color-Safe’s implementation uses minimal emissions of volatile organic compounds (VOC). Since it is also one of the longest lasting pavement markings available, Color-Safe also ensures minimal construction materials waste. Unlike thermoplastic paint, which is frequently used and needs to be reapplied every 6-12 months, MMA materials can last up to 10 years.

Finally, Color-Safe was designed to be extremely easy to apply, as well as fast curing in a wide variety of temperatures. For university officials, this meant minimizing labor cost as well as ensuring the bike lanes would be up and running with nominal road closures.

www.transpo.com

This article originally appeared in the issue of .

Featured

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Barbara Vick Western Branch

    Barbara Vick Western Branch

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Barbara Vick Western Branch has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.