Survey Finds More Than $4.2 Billion in Pressing Construction Needs at Federally Impacted School Districts

Washington, D.C. – A new survey, conducted by the National Association of Federally Impacted Schools (NAFIS), identifies more than $4.2 billion in pressing construction needs at federally impacted school districts nationwide. These school districts encompass nontaxable Federal property, such as military installations, Indian lands, low-rent housing, and other Federal properties.

School construction is financed primarily at the local level, usually through bonds. Federally impacted school districts often have minimal assessed land value - and thereby minimal bonding capacity - because of the presence of nontaxable federal property. These school districts lack the local resources to address urgent facility needs, not to mention modernize facilities.  

NAFIS surveyed its member school districts about the status of their school facilities. Respondents – 218 school districts from 37 states – reported compelling facility needs.

Twenty-six percent of respondents cited school district facilities that are more than 80 years old, and 65-percent said the overall condition of facilities in their school districts are either fair or poor. Respondents named a variety of essential construction projects, including health and safety related issues such as lead and mold, outdated electrical, HVAC and plumbing systems, leaky roofs, expired boilers, aging technology, and building capacity due to growth in student enrollment.

The total estimated cost to address pressing construction needs in these school districts exceeds $4.2 billion, with the estimated cost of all capital construction needs topping $13 billion. Yet Congress only appropriated $17.4 million in construction funding for the Impact Aid Construction line item in Fiscal Year 2017. What's more, 82-percent of respondents cited lack of funds as a reason to defer capital construction projects, and 83-percent of respondents said they could start their most pressing capital project within a year if funds were available. 

To read the full report, visit www.nafisdc.org

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • Minnesota District Partners with Kraus-Anderson on Four Construction Projects

    Stillwater Area Schools in Lake Elmo, Minn., recently announced a partnership with Kraus-Anderson for construction projects at four schools in the district, according to a news release. The projects’ funding comes from a $175-million referendum passed in November 2023.

  • University of Kentucky Stormwater Harvesting System Receives Award

    The Utilities and Energy Management team from the University of Kentucky recently received a Grand Award at the 2025 Engineering Excellence Awards, according to a university news release. The award from the American Council of Engineering Companies of Kentucky was for the university’s Central Utility Plant (CUP) Stormwater Harvesting System, which activated in fall 2023.

  • K12 Tutoring Earns Every Student Succeeds Act Level II Validation

    Personalized online tutoring service K12 Tutoring recently announced that it has received Level II validation underneath the Every Student Succeeds Act (ESSA), according to a news release. The independently validated study provides evidence of K12 Tutoring’s role in creating positive student outcomes through effective academic intervention and research-based solutions.

Digital Edition