Survey Finds More Than $4.2 Billion in Pressing Construction Needs at Federally Impacted School Districts

Washington, D.C. – A new survey, conducted by the National Association of Federally Impacted Schools (NAFIS), identifies more than $4.2 billion in pressing construction needs at federally impacted school districts nationwide. These school districts encompass nontaxable Federal property, such as military installations, Indian lands, low-rent housing, and other Federal properties.

School construction is financed primarily at the local level, usually through bonds. Federally impacted school districts often have minimal assessed land value - and thereby minimal bonding capacity - because of the presence of nontaxable federal property. These school districts lack the local resources to address urgent facility needs, not to mention modernize facilities.  

NAFIS surveyed its member school districts about the status of their school facilities. Respondents – 218 school districts from 37 states – reported compelling facility needs.

Twenty-six percent of respondents cited school district facilities that are more than 80 years old, and 65-percent said the overall condition of facilities in their school districts are either fair or poor. Respondents named a variety of essential construction projects, including health and safety related issues such as lead and mold, outdated electrical, HVAC and plumbing systems, leaky roofs, expired boilers, aging technology, and building capacity due to growth in student enrollment.

The total estimated cost to address pressing construction needs in these school districts exceeds $4.2 billion, with the estimated cost of all capital construction needs topping $13 billion. Yet Congress only appropriated $17.4 million in construction funding for the Impact Aid Construction line item in Fiscal Year 2017. What's more, 82-percent of respondents cited lack of funds as a reason to defer capital construction projects, and 83-percent of respondents said they could start their most pressing capital project within a year if funds were available. 

To read the full report, visit www.nafisdc.org

Featured

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • NWEA Report Recommends K–12 Natural Disaster Recovery Strategies

    The Northwest Evaluation Association (NWEA), a K–12 assessment and research organization, recently announced the release of a new playbook for schools and communities recovering from extreme weather events, according to a news release.

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Illinois State University Breaks Ground on College of Fine Arts Transformation

    Illinois State University in Normal, Ill., recently held a groundbreaking ceremony for the Wonsook Kim College of Fine Arts transformation project, according to university news. The series of new constructions and renovations will upgrade spaces in Centennial East, the Center for the Visual Arts, and the Center for the Performing Arts, as well as replace the existing Centennial West facility with a new Commons Building.