How a Portable Sink Helped an Art Classroom Run More Smoothly

Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom, and students lose valuable time leaving the room to wash up, complicating clean-up after class.

Administrators at Las Vegas High School found an economical solution to their sinkless art classroom, one that didn’t require contracting out a plumbing job to tear out walls and replace pipes. They bought a portable sink from Monsam, an Antioch, California-based company that serves schools and other institutional clients.

“It’s convenient to have the sink in the classroom since the students use a lot of water-based materials,” said Caitlynn Moore, the high school's office manager. “It also helps with cleanup time after messy lessons and keeps students from having to leave the room for water.”

Many school buildings constructed in the late 20th century were designed around fixed classroom uses, with specialized plumbing limited to science labs and designated art rooms. As curricula evolved to incorporate more hands-on, project-based learning — and as schools responded to changing needs by recasting standard classrooms for art and music instruction — those design assumptions continue to limit instruction today, particularly in buildings that have not undergone major renovations.

Las Vegas High School’s solution operates independently of permanent plumbing and runs through a standard electrical outlet. Ongoing maintenance is limited to refilling the water tanks, reducing the need for facilities staff involvement. And because the unit does not require in-and-out connections to the building’s pipes, it could be installed without wall modifications, permits, or classroom shutdowns.

Equipment purchases often move through district review processes designed to ensure safety, compliance and fiscal oversight — a necessary step, but one that can extend project timelines beyond a single academic term. While the portable sink represented a one-time equipment purchase, administrators avoided the added cost and staff time required to scope, bid, and oversee a plumbing retrofit in a decades-old building.

“The purchasing process took a bit longer on our end, but having the sink in the classroom has made day-to-day use much easier for both students and staff,” Moore said. “Our art teacher loves it, and she has said it has made her life a lot easier, having it in her workspace."

The portable sink allowed the school to address the issue immediately, rather than waiting through a months-long bid and construction process.

About the Author

Dana Chery is the co-founder and COO of Monsam Portable Sinks.

Featured

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Armstrong World Industries Acquires Parallel Architectural Products

    Armstrong World Industries, provider of interior and exterior architectural applications, recently announced that it has acquired the Colorado-based Parallel Architectural Products, according to a news release.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.