How a Portable Sink Helped an Art Classroom Run More Smoothly

Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom, and students lose valuable time leaving the room to wash up, complicating clean-up after class.

Administrators at Las Vegas High School found an economical solution to their sinkless art classroom, one that didn’t require contracting out a plumbing job to tear out walls and replace pipes. They bought a portable sink from Monsam, an Antioch, California-based company that serves schools and other institutional clients.

“It’s convenient to have the sink in the classroom since the students use a lot of water-based materials,” said Caitlynn Moore, the high school's office manager. “It also helps with cleanup time after messy lessons and keeps students from having to leave the room for water.”

Many school buildings constructed in the late 20th century were designed around fixed classroom uses, with specialized plumbing limited to science labs and designated art rooms. As curricula evolved to incorporate more hands-on, project-based learning — and as schools responded to changing needs by recasting standard classrooms for art and music instruction — those design assumptions continue to limit instruction today, particularly in buildings that have not undergone major renovations.

Las Vegas High School’s solution operates independently of permanent plumbing and runs through a standard electrical outlet. Ongoing maintenance is limited to refilling the water tanks, reducing the need for facilities staff involvement. And because the unit does not require in-and-out connections to the building’s pipes, it could be installed without wall modifications, permits, or classroom shutdowns.

Equipment purchases often move through district review processes designed to ensure safety, compliance and fiscal oversight — a necessary step, but one that can extend project timelines beyond a single academic term. While the portable sink represented a one-time equipment purchase, administrators avoided the added cost and staff time required to scope, bid, and oversee a plumbing retrofit in a decades-old building.

“The purchasing process took a bit longer on our end, but having the sink in the classroom has made day-to-day use much easier for both students and staff,” Moore said. “Our art teacher loves it, and she has said it has made her life a lot easier, having it in her workspace."

The portable sink allowed the school to address the issue immediately, rather than waiting through a months-long bid and construction process.

About the Author

Dana Chery is the co-founder and COO of Monsam Portable Sinks.

Featured

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.