O&G Breaks Ground at Grasso Technical High School

Grasso Tech High SchoolO&G Industries, Connecticut’s largest privately-held construction company, began work on the construction of the new Ella T. Grasso Technical High School in Groton, Connecticut.

O&G was selected as the Construction Manager for the $98.3 million dollar construction project. The project will include construction of a new 220,000 square foot facility on the existing site.  The new school will be built adjacent to the current facility with completion of the new building expected in the fall of 2019 for arriving students, followed by demolition of the existing school where new athletic facilities will be sited on its former footprint. 

Grasso serves students from 24 towns in Southeastern Connecticut with an annual enrollment of over 500 students.  Programs offered at the school include Automotive Technology, Culiary Arts, Electrical, Manufacturing Technology, Plumbing & Heating, HVAC and Information Systems Technology.   The new facility will allow the school to serve 800 students from throughout the region, offering eleven programs in technology and core programs.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition