Arlington Independent School District's Eddy + Debbie Peach Elementary School Completed

A Collaborative Environment Fostering Imagination Through Playful + Creative Design.

Debbie Peach Elementary School The new Eddy & Debbie Peach Elementary School for Arlington ISD is located on a 9.7-acre site north of Interstate-30. The educational program of the new school includes core classrooms, grade level collaboration spaces and shared academic spaces including science, music, and art. The facility also incorporates a state of the art Media Center, Cafetorium and a multi-purpose Gymnasium along with a joint use space with the Boys & Girls Club, providing after school activities for all school ages.

The project features an engaging site design that flows from the front of the site, through the building, and to the exterior public spaces near the back of the site. The circular and playful motifs create multiple unique experiences as a student moves through this central core of the building. Some of the key areas highlighted along this core are an outdoor art and science learning lab on the school’s second level, a double volume media center, and an outdoor learning environment that serves as an extension of the media center, as well as outdoor break out spaces for core classrooms. All of these spaces allow for an inspiring and stimulating educational environment for students and teachers. Along this central core on the south side of the school is a two-level classroom bar with break out collaboration spaces, all with natural daylight and views to the landscape. The public spaces are located on the north side of the central core and are situated to allow for easy pick up and drop off and can be secured from the academic portions of the building for evening activities. The architecture and interior design for the project was completed by Perkins+Will.

For more information, visit Eddy & Peach Elementary.

Featured

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

  • Agualta STEAM Engine

    Outdoor Learning Spaces and Biophilic Design Create Community in East Los Angeles

    Griffith STEAM Magnet Middle School's Agualta STEAM Engine blends education, community, and nature through its adaptable design.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

Digital Edition