Scientifically Advanced Research Complex Completed at Arizona State

Studio Ma has unveiled their innovative, scientifically advanced building concept created for Arizona State University’s planned ISTB-7 — an interdisciplinary science and research complex with a vast atrium biome full of plants and water.

ASU Science Center

Bringing together regenerative and bioclimactic technologies, ISTB-7 is conceived as a highly sustainable science and technology center for the ASU Tempe campus. The transit-oriented solution includes a light rail station, and the structure’s climate-responsive, regenerative technologies transform it into a source of energy, water, carbon and other nutrients.

The Studio Ma design for the Interdisciplinary Science & Technology Building, or ISTB-7, ensures it will produce enough carbon, energy, water and waste to achieve triple net-zero performance. To do so, ISTB-7 building materials absorb carbon and convert it to life-giving nutrients for durable materials and enriched soil. Its atrium biome purifies waste air, and a wetlands landscape recycles water using natural, bio-based methods. Rainwater is collected, and sun shades keep the interiors cool and comfortable.

Materials incorporate ASU’s own cutting-edge scientific research on integrated carbon-capture technology. Methods to save and produce energy include air currents, evapotranspiration and photovoltaics. The complex treats and recycles sewage for use as greywater using low-energy, bio-based systems. With its rail transit connection, the complex creates a new campus gateway.

Featured

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.