Christa McAuliffe Elementary School Enjoys Multiple Benefits of Premium Rubber Flooring

Christa McAuliffe Elementary SchoolChrista McAuliffe Elementary School in Concord, New Hampshire, is one of three new, futuristic elementary schools designed to meet the changing needs of 21st-century learning. The school understands the evolution of the library and incorporates a variety of mediums and methods of consuming information. Throughout the facility, norament® grano premium rubber flooring supports open, collaborative, flexible and technology-integrated multi-use learning spaces.

“The facility is not only an elementary school but also a community building that’s heavily used before and after school for several town programs, such as the Boys & Girls Club,” says Matt Cashman, director of facilities & planning. “The durability and increased stain resistance – without the use of chemical cleaners or coatings – is a huge benefit realized by our district when compared to our previous dealings with VCT.”

elementary school rubber flooringThe selection of nora® flooring also helped the district meet Northeast-CHPS standards of sustainability. “The elimination of coatings and chemicals has been a breath of fresh air, literally,” says Rusty Bonner, head custodian. The absence of fumes often associated with these substances has positively impacted the well-being of the maintenance staff, as well as students and teachers.

“Just a few regular washes with little more than water erases any staining, allowing the floors to easily maintain their new appearance,” says Bonner. This is especially beneficial in spill-prone areas, including the cafeteria and art rooms.

“It’s an easy-maintenance flooring,” Bonner continues. “As a result, we can devote more time to cleaning alternate surfaces, such as glass.”

The rubber flooring also enhances acoustics. Open project areas throughout the school, including an amphitheater, circular story room, reading nooks and spaces for collaboration, benefit from the floor’s ability to attenuate unwanted ambient noise, allowing students and staff to better focus on listening and learning.

Sponsored by: nora systems, Inc.

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Kent State Academic Building Earns LEED Silver Certification

    Kent State University in Kent, Ohio, recently announced that its newest academic building, Crawford Hall, has earned a LEED Silver certification from the U.S. Green Building Council, according to a news release. The facility was recognized for its innovative design, water conservation technologies, energy-efficient systems, and sustainable construction materials, among other features.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition