University of Portland Breaks Ground on New Academic Building

Groundbreaking on the University of Portland’s new academic building, Dundon-Berchtold Hall, took place in September. Board of Regents member Amy Dundon-Berchtold and Jim Berchtold ’63, were joined in turning the ceremonial first shovel by University President Rev. Mark L. Poorman, C.S.C.; Provost Thomas Greene; University Board of Regents Chair Thomas Arndorfer; and ASUP President Brandon Rivera.

University of Portland

The Dundon-Berchtolds made the $15 million lead gift commitment for construction of the hall on the university's Portland, OR, campus. This gift also funded the Dundon-Berchtold Institute for Moral Formation and Applied Ethics, which will be housed in the new building. Along with providing a home for the Institute, the new academic center will also add over 63,000 square feet of classrooms, offices and the recently announced Brian Doyle Lecture Hall.

In his remarks, Fr. Poorman called the groundbreaking a “hope-filled occasion.” He went on to say, “Dundon-Berchtold Hall is a critical step in the university’s commitment to providing the best possible education for our students. One that’s holistic and intellectually rigorous, and character focused, and grounded in faith.”

While thanking the many donors who have contributed to construction of the Hall, Fr. Poorman extended special gratitude to the Dundon-Berchtolds for moving the university “from a conversation phase to a happening phase.” And he noted that the university was proud to name the building in honor of them and their generous commitment.

Dundon-Berchtold Hall will provide much needed academic space for the campus. As the student population at the university has grown 30 percent over the past decade, classroom space has remained the same. Many of the classrooms in the hall will be designed for interactive learning, with spaces that are equipped with moveable furniture and updated technology. Other “cluster” classrooms will be used for small groups of students to work cooperatively and collaboratively together on projects and assignments, a core requirement of many university courses across all disciplines.

Dundon-Berchtold Hall is set for completion in January 2019.

Featured

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.