Puerto Rico High School Re-Envisioned Following Hurricane

Wesleyan High SchoolWith the intention to integrate building design techniques and technologies that not only comply with needs, but also respond to the human experience, building life cycle and operational efficiency, Fosis Corp. has started a new project which will re-create Wesleyan Academy's high school building.

Along with many other buildings in Puerto Rico, the Academy high school building was destroyed due to Category 5 hurricane Maria. Consequently, Fosis proposed a project to respond to the needs of high school staff and students.

Fosis cofounder and Principal Designer, Carlos Martinez Alfaro, explained "the project aims to relate with the day-to-day life of the student. Our intention is to achieve a space that stimulates learning and creates a sense of identity."

The design intends to promote natural light and ventilation, and scheme spaces that will adjust to students and the administration while integrating the existence gym facility with the new construction.

Designing a building that creates a unique identity while respecting the campus scale and administrative vision and helps create multidisciplinary integration are major goals of the new project. Nevertheless, the design seeks to provide an enriching student life experience, increase student retention and loyalty while attracting new students.

With an initial investment of $1.5 million, the construction is expected to begin in January 2018 and be completed by August 2018.

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.