Synced Clocks Keep Everyone on Same Page

American Time

American Time’s EverAlert synchronized clocks keep every student and staff member on the same schedule and make sure classes and events always start on time at Elkhart Christian Academy.

Elkhart Christian Academy was struggling with wall clocks that didn’t stay in sync. This caused class times to start early or end late, and maintenance staff was frequently called to adjust clocks. For example, during daylight saving time (DST) changes, someone worked over the weekend to adjust the clocks, which then took 24 hours to sync.

The school was considering American Time’s synchronized clock technology when it also learned about EverAlert, American Time’s three-in-one communications platform. Elkhart realized this comprehensive solution would solve even more of its operational challenges.

The EverAlert platform and wall-mounted display units function as three systems in one: An emergency notification system that shares clear and timely information during threats; a message system that displays news and tailors it by audience; and a synchronized clock system that ensures everyone is on the same time.

Elkhart installed EverAlert in each classroom and several common areas. As a result, students and staff are kept on time and maintenance spends less time on clocks because they are in sync and automatically update for DST.

When fire, tornado, or lockdown drills occur, EverAlert’s visual display helps clearly identify the alarm type so teachers and students react more quickly.

Daily announcements specific to the elementary, middle, or high school are displayed on the appropriate EverAlert unit in each classroom. Teachers can also post their own classroom-specific messages.

Ryan Pease, tech support at the Academy, notes, “The teachers really like receiving daily messages on EverAlert without having to check email. It gives teachers advanced notification and they like that…We’ve really come to rely on EverAlert for many things.”

www.american-time.com

This article originally appeared in the issue of .

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition