Academic Building Completed at UMass Amherst

The first and largest cross-laminated timber (CLT) academic building in the U.S. has opened at the University of Massachusetts (UMass) Amherst. Designed by Leers Weinzapfel Associates, the multidisciplinary John W. Oliver Design Building brings together 500 students and 50 faculty across four departments into a light-filled 87,000-square-foot space. As a beacon of sustainability, the building features energy-saving elements, such as chilled beams and radiant flooring, and targets LEED Gold certification.

UMASS Amherst Cross Timber Building

Photo: Albert Vecerka / Esto

Cross-laminated timber has long been praised for its durability, lightness, and speed of construction, however, has been slow to catch on in the U.S. relative to Europe and Canada. As the largest installation of wood-concrete composites in North America, the UMass Design Building paves the way in a growing trend of “mass timber” buildings. Cast-in-place concrete and CLT make up the Design Building’s floor slabs, while glue-laminated timber was used for the posts, beams, shear wall cores, and “zipper” trusses.

To reference the colors and patterns of the nearby forests, the four-story building is wrapped in a durable envelope of copper-colored anodized aluminum panels punctuated with vertical windows. The glazing and skylights maximize daylight to the interior to reduce reliance on artificial lighting. Stormwater is managed onsite with bioswales and timber dams that filter and redirect runoff back to the Connecticut River.

“To create a center space of collaboration, a coiling and rising band of studios, faculty offices and classrooms surrounds a skylit commons for gathering and presentations,” write the architects. “The building also forms a green roof terrace, a contemplative space shared by the studios and faculty and a potential experimental space for the landscape department. The slope of the site creates a tall four-story façade on the west facing the mall, and the rising structure invites the community into the building and reveals the activities within.”

Featured

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Indiana Wesleyan University Schedules Grand Opening for New Welcome Center

    Indiana Wesleyan University recently announced that it will soon open a new Welcome Center on its campus in Marion, Ind., according to a news release. The facility will serve as the home base for prospective students and their families to learn more about the university and student life there. A ribbon-cutting ceremony is scheduled for February 19.