Massachusetts School Gets Additions and Renovations

Encouraging creative thinking, collaboration and community is at the core of the addition and renovation project, now open, at the Brimmer and May School in Chestnut Hill. Designed by the Boston office of Perkins+Will, the new and repurposed spaces foster active learning at the co-ed, independent PreK-12 school.

“Historically, we have been a school that leads with pedagogy and curriculum,” said Judy Guild, head of school at Brimmer and May. “Perkins+Will was a great partner for us in that they engaged teachers and staff to determine the optimal types of spaces required to teach students, to drive creativity, and to foster a sense of community. This project has created a flexible, open space where students naturally gravitate.”

The addition supports independent and collaborative work, critical thinking, and analytics, enhanced by emerging technologies and hands-on problem solving. The space includes a new innovation lab, dedicated maker space with equipment for fabrication, a STEAM (science, technology, engineering, arts, and mathematics) room and a “student commons” designed for multi-uses along with additional space to support group work, independent thinking and project-based learning. The additional classrooms and new administrative areas are strategically located to promote teacher collaboration while integrating an inviting and secure entryway.

Brimmer and May

“It was our goal to ensure an integrated design process bringing together the school’s pedagogy along with the need to provide the flexibility that supports a multidisciplinary approach to learning, within the context of Chestnut Hill’s residential neighborhood,” says Brooke Trivas, K-12 practice leader and principal at Perkins+Will.

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition