World Floor Covering Association, Magnetic Building Solutions Launch New Underlayment System

Dalton, Ga. – World Floor Covering Association (WFCA) has announced the launch of MagneBuild by Magnetic Building Solutions (MBS), an LLC partially owned by the WFCA. MagneBuild is a revolutionary new underlayment system utilizing magnetic technology as the foundation for all types of floors. It will make its debut at TISE 2018.

The new MBS technology works across all flooring categories from carpet to hardwood to stone. To install flooring with this product, MagneBuild simply needs to be “rolled out” over any smooth, clean and dry subfloor. It alleviates many installation issues, eliminating the need to bond flooring. It can also be used at any stage in the construction process.

“The ground breaking ‘roll and go’ attributes of MagneBuild are made possible by the combination of two proprietary layers,” said Scott Humphrey, CEO, WFCA. “The magnetic base layer is applied to the subfloor, then topped with the receptive layer consisting of the actual flooring.” That surface layer—carpet, stone, or tile—adheres to the magnetic base by virtue of the proprietary MBS technology.

The magnetic subfloor also acts as a sound barrier, and even offers crack isolation protection for ceramic floors. Once the subfloor is installed end-users can easily change from an LVT to a ceramic tile to a carpet tile and back again effortlessly with no floor prep time.

Aside from the ease of use, interchangeability and aesthetic flexibility associated with the MagneBuild system, the new product provides quantified savings. “This key selling feature translates to less down-time for contractors, builders and other businesses,” Humphrey said. He explained MBS products are ideally suited for commercial settings where timing is a critical factor.

The new MBS technology utilizes recycled materials and is entirely environmentally friendly, with no VOC emissions at any stage of the process. End users can even easily roll-up and take their flooring with them if they chose when they move.

For more information, visit magneticbuildingsolutions.com.

Featured

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • Quattrocchi Kwok Architects Opens New Office in Denver

    Education planning and design firm Quattrocchi Kwok Architects (QKA) recently announced that it has opened a new office in Denver, Colo., the firm’s third overall. QKA is headquartered in Santa Rosa, Calif., and runs an East Bay Area office in Oakland.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.