Concrete Slab Configuration Raises Concerns Among Sports Flooring Installers

OAKBROOK TERRACE, IL – Concrete slab configuration is very important in the success of a new maple floor installation.  Placing a below-slab vapor barrier directly beneath the concrete slab is proper and typical.  Placing any type of fill material between the below-slab vapor barrier and the concrete slab frequently causes moisture-related problems with the finished maple surface.

The Maple Flooring Manufacturers Association (MFMA) requires the general contractor to provide a concrete slab troweled smooth and flat to a tolerance of 1/8 of an inch in a 10-foot radius, subject to the approval of the MFMA wood flooring contractor. By placing sand between the vapor barrier and the slab, a flatter concrete slab with less initial curling can be produced.  However, this configuration allows the sand to act like a sponge—trapping moisture within the sand layer during the concrete pour. Over time, trapped moisture can migrate up through the concrete slab and cause moisture-related difficulties with subfloor components and the finished wood flooring surface.

The only MFMA-recognized method for reading concrete moisture levels within a slab is by testing its relative humidity. Please refer to the instructions of the manufacturer’s relative humidity test kit for complete details on how to administer the test correctly. MFMA recommends the relative humidity level for a concrete slab for a non-glue-down maple floor system be 85 percent or lower and for glue down systems the concrete slab relative humidity level should be 75 percent or lower before installation.For concrete relative humidity conditions above MFMA’s recommendation consult your MFMA Sport Floor Contractor or your MFMA Manufacturer.

For more information regarding variations to MFMA’s recommended concrete slab configuration, please contact MFMA’s technical director at 888/480-9138 or email [email protected].

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition