Two School Construction Projects Completed in New York City

PS 338 Brooklyn NYEW Howell Construction Group, one of the region’s leading education, retail, cultural, government and healthcare builders, has completed two school construction projects for the School Construction Authority—P.S. 338, a new primary/intermediate school on Coney Island Avenue in Brooklyn, N.Y. as well as the expansion and renovation of P.S. 49 in Middle Village, Queens. Both projects were finished in time to accommodate students for the 2017-2018 school year.

Designed by Purcell Architects, P.S. 338 was built from the ground up to accommodate 742 students ranging from Pre-K to eighth grade. The 106,000-square-foot, $68.5-million project features five floors with a partial cellar. The construction comprised two major blocks; a five-story structure with the primary grades on the lower floors and the intermediate classes above. A separate five-story building will include, lower level cafeteria and gymnasium. The building is set back from Coney Island Avenue to provide a buffer from the sidewalk and street. The side streets allow for a drop off area for school buses and a wider sidewalk to ease congestion.  

EW Howell Construction Group was also awarded a contract to construct a 107,000-square-foot addition and renovation, for P.S. 49, a staple of the Middle Village, Queens community for generations. The $31.5-million project was designed by Ciardullo Architects, which kept the building’s original historic 1920s façade detail. The school is a designated site by the NYS Historic Preservation Office for its beautiful brick work and limestone facades. EW Howell added an ‘L’ shaped building to the outdoor area, which allows extra space for outdoor playgrounds and beautiful landscaped views of the Juniper Valley Park, and completed the interior renovation and exterior restoration.

In addition to P.S. 338 in Brooklyn and P.S. 49 in Queens, EW Howell’s Education Division, led by Vice President John K. Hagen, P.E., has completed several more projects for the School Construction Authority, whose mission is to design and construct safe, cost-effective and environmentally sound schools for communities in New York City. EW Howell has also worked on in Manhattan. EW Howell has also been awarded an addition and renovation project for P.S. 303in Forest Hills, expected to be complete in January 2021.

Founded in 1891, EW Howell Construction Group is a leading New York-based General Construction and Construction Management firm with offices in Manhattan and on Long Island.

Featured

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.