School Celebrates Grand Opening

The Bancroft School in Mount Laurel, N.J., celebrated its grand opening on Monday, December 18, 2017. The new campus provides a regional destination of hope where expanded and upgraded learning and living spaces are designed specifically to meet the needs of special education students and their families.

Dewberry, a privately held professional services firm, supported the school with selecting and then developing an appropriate site for the new 80-acre campus.

 Following site selection, Dewberry was responsible for full land development services, including survey; landscape architecture; and site/civil, geotechnical, environmental, and traffic engineering. The design actualizes Bancroft’s vision to provide opportunities for exploration and community interaction with outdoor walking paths of various scales; locations for play, including sports fields and playgrounds; and garden areas that focus on bringing nature into the everyday interaction of the children in the school. Dewberry studied how the school’s special needs students would use the space and designed secure areas that provide a safe environment without feeling constrained or confining. Hardscape and landscape materials and plantings were carefully selected to keep users safe.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.