School Celebrates Grand Opening

The Bancroft School in Mount Laurel, N.J., celebrated its grand opening on Monday, December 18, 2017. The new campus provides a regional destination of hope where expanded and upgraded learning and living spaces are designed specifically to meet the needs of special education students and their families.

Dewberry, a privately held professional services firm, supported the school with selecting and then developing an appropriate site for the new 80-acre campus.

 Following site selection, Dewberry was responsible for full land development services, including survey; landscape architecture; and site/civil, geotechnical, environmental, and traffic engineering. The design actualizes Bancroft’s vision to provide opportunities for exploration and community interaction with outdoor walking paths of various scales; locations for play, including sports fields and playgrounds; and garden areas that focus on bringing nature into the everyday interaction of the children in the school. Dewberry studied how the school’s special needs students would use the space and designed secure areas that provide a safe environment without feeling constrained or confining. Hardscape and landscape materials and plantings were carefully selected to keep users safe.

Featured

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.