School Celebrates Grand Opening

The Bancroft School in Mount Laurel, N.J., celebrated its grand opening on Monday, December 18, 2017. The new campus provides a regional destination of hope where expanded and upgraded learning and living spaces are designed specifically to meet the needs of special education students and their families.

Dewberry, a privately held professional services firm, supported the school with selecting and then developing an appropriate site for the new 80-acre campus.

 Following site selection, Dewberry was responsible for full land development services, including survey; landscape architecture; and site/civil, geotechnical, environmental, and traffic engineering. The design actualizes Bancroft’s vision to provide opportunities for exploration and community interaction with outdoor walking paths of various scales; locations for play, including sports fields and playgrounds; and garden areas that focus on bringing nature into the everyday interaction of the children in the school. Dewberry studied how the school’s special needs students would use the space and designed secure areas that provide a safe environment without feeling constrained or confining. Hardscape and landscape materials and plantings were carefully selected to keep users safe.

Featured

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.