Furniture That Balances Form and Function

furniture for dining hall

Thos. Moser Contract provided furniture and insight during a much-needed dining hall replacement at DePauw University.

The new Hoover Dining Hall is a transformational space for the DePauw University campus, offering a variety of rooms that seat 750 students, faculty and staff of this small liberal arts college in Greencastle, IN. Hailed as a much needed replacement to an existing dining hall that blocked important views on campus, the new facility is a well-liked and important hub for the university.

The main dining room, which seats up to 460 for three meal seatings each day, can be reconfigured to seat 364 for lectures and other events; a mezzanine provides an additional 112 seats for dining. The 80-seat Wallace-Stewart Commons accommodates faculty and staff dining and also acts as the University Board of Trustees’ meeting room, while four special dining rooms seat groups from 12 to 50.

As associate vice president for Facility Management, Warren Whitesell was heavily involved with the Hoover Hall project. He and his team worked directly with Robert A.M. Stern Architects to make a number of critical decisions regarding finishes, materials, and the overall look and aesthetic of the multiple dining and food service spaces.

The firm introduced Whitesell to Thos. Moser Contract and the custom pieces that would provide the right balance of form, function, and longevity for the facility. “After an initial introduction to the Thos. Moser Contract brand, we decided to start on creating the dining chairs first,” says Whitesell. “As we got closer to pinning down the product, I started to engage directly with Thos. Moser Contract, and they even came out to DePauw to show us what they completed based on their conversations with the architecture firm.

“Beyond providing the most competitive pricing, the company was always receptive and happy to provide updates and information throughout the process, often unprompted. From stain samples to video of the fabrication process, information was constant and much appreciated.”

www.mosercontract.com

This article originally appeared in the College Planning & Management April 2018 issue of Spaces4Learning.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition