How can we move to network-based communication?

Many schools rightly see network-based distributed communication—moving paging, intercom, and bells to the LAN away from separate hard-wired analog systems—as a way to increase efficiency, flexibility, safety, and even space. Replacing huge paging amps, redundant wiring, and 70-volt speakers with a server, a software interface, and a variety of flexible IP-addressable endpoints has numerous advantages. The most basic include giving office staff the power to set up different bell schedules for different zones, turn them off on the weekend, and make changes anytime with a few clicks.

Schools can also gain safety functionality they never had before: panic buttons in classrooms, silent alerts, and instant triggering of lockdowns and all-clears from the office or even a mobile device. Integrating all these methods of communication under a single platform is a big plus.

But it’s not an impulse buy. The time to move to a modern school communication platform isn’t when your current analog amp goes down. This takes planning—and not just at the individual school level.

Most districts want standardization throughout their schools. Clearly, continuing to standardize on 1960s technology is not acceptable, but making a sweeping district-wide upgrade to IP-based systems is daunting. A more realistic approach is to build the new digital standard into new construction projects, then bring older schools up to that IP-based standard over time. This ensures you’re designing for the future rather than digitizing old habits and forces a district-wide approach to daily communications and safety protocols you can implement methodically over a number of years.

It’s a big task, but very worthwhile, and fortunately there are experienced professionals to help you execute a successful plan.

This article originally appeared in the School Planning & Management April 2018 issue of Spaces4Learning.

About the Author

Jaime Mendez serves as architectural consultant at FrontRow. He can be reached at [email protected].

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition