San Bernardino Valley College: Kinesiology and Athletics Complex

San Bernardino Valley College

PHOTOS © RMA PHOTOGRAPHY

San Bernardino Valley College (SBVC) in San Bernardino, CA, has grown steadily since its establishment in 1926. When the substantial 1992 Landers and Big Bear earthquakes struck the area, however, a new sense of urgency accompanied the need to better organize and integrate facilities across the campus.

When asked to design the new Kinesiology and Athletics Complex at SBVC, HMC Architects was faced with a specific geographic challenge: The San Jacinto fault zone, which runs through the San Bernardino community, diagonally bisecting the campus. HMC’s designers had to plan around the fault zone while integrating and organizing facilities across the campus to support the safety of the rapidly growing community. With the new facility’s location at the center of campus, it was important for all site utilities—including the physical education complex and grandstands—to remain functional and uninterrupted during construction. The affected buildings were then demolished and replaced, eliminating the need to build a temporary gym and producing a seamless, less disruptive, and cost-effective solution.

The result is a three-story, 108,509-square-foot facility that features two NCAA competition gymnasium spaces, athletics and PE locker rooms, exercise and dance facilities, office space, and specialized instruction spaces. The complex leads into the updated athletics quad and a new 2,500-seat stadium with concessions, ticketing, toilet rooms, team rooms, meeting rooms, and athletic storage.

Qualities from previous buildings are combined with the new building, creating a cohesive feel across the campus. The landscaping includes a new oak woodland consisting of drought-tolerant plants and walkways, which tie the complex into the overall site.

Standing bold and proud, the facility is a campus focal point—a testament to world-class care for the college’s athletes.

This article originally appeared in the College Planning & Management May 2018 issue of Spaces4Learning.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition