New High School Planned in Los Angeles

Amino School Los AngelesOn July 22, 2014 a massive fire broke out and destroyed half of the Animo South Los Angeles High School campus. Located in one of the toughest areas in South Central Los Angeles, an area that was a central trouble spot during the 1964 Watts and the 1992 Rodney King Riots, residents’ median family income is less than $35,000/year and 25-percent of the population lives below the poverty level. Green Dot Public Schools is replacing the burned school with a new public charter high school for 630 students that is visually open but entirely secured.

The replacement building contains 11 classrooms, two science labs, a faculty lounge, new administrative and counseling offices, and public courtyard space for student gatherings and activities.

Designed on an extremely limited budget and aggressive schedule, simple cost-effective gestures were deployed in the use of cladding, fenestration, color and transparency to create a memorable sense of richness, providing a bright moment in an extremely tough inner-city community. Unlike most school that are enclosed by a property line security fence, the South Los Angeles High School building is surrounded by a 20-foot-high perforated bullet resistant metal walls that are integrated into the building design. The project architectural firm is Brooks + Scarpa. Learn more at www.brooksscarpa.com.

Featured

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

  • DLR Group Hires Higher Education Business Development Leader

    Integrated design firm DLR Group recently announced that Senior Associate Megan Todd will serve as its new Higher Education Business Development Leader, according to a news release. Her responsibilities will include building the firm’s reach and client relationships in the California higher education sector, based out of San Diego.

Digital Edition